Generator and ATS engineering

Commercial Generator and ATS Engineering

A coordinated electrical permit package for commercial standby generators and automatic transfer switches, built from actual equipment, load, service, and site information.

Commercial Permit, Structural and MEP Engineering - Fast, Coordinated, and Built Around Your Approval Deadline.

Contractor-friendly scopeWritten fee and scheduleOne ordinary AHJ cycle
Commercial engineering project
Redacted permit drawingsRedacted site plan
Scope and availability review

Project availability is determined after reviewing the scope, project location, jurisdictional requirements and required engineering disciplines. Additional insurance or specialty clearance may be required before contract or production.

Customer trigger

Generator projects that need more than a cut sheet

New standby generator

Coordinate the generator, transfer equipment, service, distribution, grounding, and accepted site interfaces.

ATS addition or replacement

Document normal and emergency sources, transfer logic basis, ratings, feeders, and one-line changes.

Load and capacity question

Develop the accepted load basis and identify missing operating information before design.

Permit rejection

Address electrical comments tied to generator, ATS, service, grounding, or equipment documentation.

Installer coordination

Give the generator installer and electrical contractor a defined engineering package and responsibility matrix.

Foundation interface

Coordinate with the separately scoped equipment-foundation service when a pad or anchorage design is needed.

Starting fees

Premium commercial scope with controlled pricing

Final fee depends on the accepted jurisdiction, existing information, building and equipment complexity, required disciplines, field needs, and deadline.

Generator + ATS package$8,500-$15,000

Defined commercial standby system.

Complex / multiple service$12,500+ custom

Multiple sources, services, or unusual operating conditions.

Site or data verification$1,500-$2,500

May be credited when stated in the proposal.

Proposal and payment policy

  • No payment is required before scope and availability review and acceptance of a written proposal.
  • Projects at or below $3,000: 100% before production after proposal acceptance.
  • Projects from $3,001-$25,000: 60% deposit; balance before final sealed issuance.
  • Projects above $25,000: 50% deposit, 30% at coordinated draft, 20% before final issuance.
  • Rush service: 40% premium when accepted in writing.
  • Site visits, surveying, geotechnical work, testing, laboratory services, and scope changes are separately priced.

Defined deliverables

What the accepted package may include

  • Existing and proposed one-lines
  • Accepted electrical load calculation
  • Generator and ATS sizing/design basis
  • Grounding and bonding details
  • Equipment layout and clearance coordination
  • Panel and equipment schedules as applicable
  • One ordinary AHJ review cycle

Turnaround control

Complete qualified requests received during operating hours target a same-business-day scope response. The written proposal confirms the production start, required intake, responsible-professional availability, review milestones, and final issuance date before payment.

Scope boundary

Hospitals, high-rise emergency systems, hazardous locations, medium voltage, data centers, standalone arc-flash studies, fuel-system design, acoustic studies, emissions permitting, and specialized structural dynamics are excluded unless qualified professionals accept them.

Project information

Send address, AHJ, records, and the real deadline

Use the project description to identify the full project address and authority having jurisdiction. Upload the files already available; additional photographs or records may follow during scope review.

Required intake

  • Project address and AHJ
  • Generator and ATS manufacturer/model/cut sheets
  • Service one-line and utility information
  • Connected and priority load list
  • Existing service and panel photographs
  • Site plan and proposed equipment location
  • Fuel type and operating intent
  • Permit comments and installation deadline

Responsible-charge statement

Engineering services are performed under the responsible charge of the appropriately licensed Grand Street Engineering professional for the applicable project and jurisdiction. Grand Street Engineering does not offer after-the-fact sealing, rubber stamping, or a stamp-only service.

Owner, equipment, geometry, criteria, or scope changes require a written change order. Final issuance remains subject to professional review and required payment.

Scope and availability review

Start with the facts you already have

Include the project address, AHJ, requested service, current problem, permit comments, deadline, and decision-makers. The five-minute response target applies during operating hours; the same-day proposal standard applies after qualification and sufficient scope information.

Written proposalScope, price, schedule, assumptions, exclusions, clearance conditions, and payment terms
FilesPlans, photographs, comments, surveys, reports, cut sheets, and records may be uploaded now or through the approved secure follow-up link
Submitting information does not create an engineering engagement. Work begins only after scope and availability review, written acceptance, required coverage and authorization clearance, and required payment.

Open Secure Project Intake Form

If the embedded form does not load, open the secure form above or call 913-423-8619. Do not send confidential engineering records by ordinary text message.

Frequently asked questions

Scope and payment questions

Does this include the concrete pad?

Only when equipment-foundation and anchorage engineering is separately listed or coordinated in the proposal.

Can you use installer-selected equipment?

Equipment can be evaluated when complete cut sheets, ratings, dimensions, weights, and operating information are provided.

Is emergency-system work included?

Not automatically. High-rise, healthcare, legally required, and other high-consequence systems require specific competence and responsible-charge acceptance.

What starts the schedule?

The proposal identifies the deposit, required intake, and confirmed start condition. Rush scheduling carries a 40% premium when accepted.

Ready to define the engineering path?

Send the address, AHJ, current documents, and approval deadline.

CallTextQuoteUpload