Tenant improvements
Coordinate mechanical, electrical, and plumbing plans around the same architectural and equipment basis.
Commercial MEP engineering
Coordinated mechanical, electrical, and plumbing documents for contractors and owners who need one defined permit package instead of disconnected discipline responses.
Commercial Permit, Structural and MEP Engineering - Fast, Coordinated, and Built Around Your Approval Deadline.



Project availability is determined after reviewing the scope, project location, jurisdictional requirements and required engineering disciplines. Additional insurance or specialty clearance may be required before contract or production.
Customer trigger
Coordinate mechanical, electrical, and plumbing plans around the same architectural and equipment basis.
Address cooking, exhaust, make-up air, electrical loads, plumbing fixtures, and equipment coordination within the accepted scope.
Prepare MEP permit documents for defined interior buildouts, renovations, and occupancy changes.
Replace incomplete or absent permit disciplines after existing documents and AHJ comments are reviewed.
Document accepted HVAC, electrical, plumbing, and service impacts for permit review.
Revise the engineering package through one ordinary AHJ review cycle when included.
Starting fees
Final fee depends on the accepted jurisdiction, existing information, building and equipment complexity, required disciplines, field needs, and deadline.
Limited, well-documented commercial scope.
Coordinated commercial buildout package.
Equipment-heavy or multi-discipline scope.
Defined deliverables
Complete qualified requests received during operating hours target a same-business-day scope response. The written proposal confirms the production start, required intake, responsible-professional availability, review milestones, and final issuance date before payment.
Architectural design, fire sprinkler and fire alarm engineering, commercial kitchen consulting, utility fees, energy modeling, surveying, geotechnical work, commissioning, testing, and field investigation are separate unless listed.
Project information
Use the project description to identify the full project address and authority having jurisdiction. Upload the files already available; additional photographs or records may follow during scope review.
Engineering services are performed under the responsible charge of the appropriately licensed Grand Street Engineering professional for the applicable project and jurisdiction. Grand Street Engineering does not offer after-the-fact sealing, rubber stamping, or a stamp-only service.
Owner, equipment, geometry, criteria, or scope changes require a written change order. Final issuance remains subject to professional review and required payment.
Scope and availability review
Include the project address, AHJ, requested service, current problem, permit comments, deadline, and decision-makers. The five-minute response target applies during operating hours; the same-day proposal standard applies after qualification and sufficient scope information.
Open Secure Project Intake Form
If the embedded form does not load, open the secure form above or call 913-423-8619. Do not send confidential engineering records by ordinary text message.
Frequently asked questions
Only when structural work is specifically listed in the proposal. MEP and structural scopes are coordinated but not silently bundled.
A same-day scoping response is the operating target for complete qualified requests. The production schedule is confirmed in the written proposal before payment.
One ordinary AHJ engineering review cycle is included unless the proposal states otherwise. Owner, equipment, geometry, code-basis, or scope changes require a change order.
Engineering services are performed under the responsible charge of the appropriately licensed Grand Street Engineering professional for the applicable project and jurisdiction.
Send the address, AHJ, current documents, and approval deadline.